UX Contract › Awards
CONTRACT AWARDS · 2026
Contract awards: “construction”
The 50 largest matches for “construction” among the 4,489 largest contract awards we keep from fiscal year 2026 (Oct 1, 2025 to Sep 30, 2026) (the biggest awards for every agency, state and top industry), largest first, $159.16 billion in total award amount. Search all construction awards on USAspending.gov ↗
| Recipient | Amount | Agency | What | Dates | Award |
|---|---|---|---|---|---|
| BECHTEL NATIONAL, INC. WA | $17.88 billion $17,883,024,035 | Department of Energy | NAICS 234930 INDUSTRIAL NONBUILDING STRUCTURE CONSTRUCTION | Dec 15, 2000 to Apr 11, 2027 | DEAC2701RV14136 ↗ |
| ELECTRIC BOAT CORPORATION CT | $16.24 billion $16,238,775,949 | Department of Defense Department of the Navy | CONSTRUCTION OF VIRGINIA CLASS BLOCK III SUBMARINES. NAICS 336611 SHIP BUILDING AND REPAIRING | Dec 22, 2008 to Aug 31, 2023 | N0002409C2104 ↗ |
| HUNTINGTON INGALLS INCORPORATED MS | $8.32 billion $8,322,740,497 | Department of Defense Department of the Navy | CONSTRUCTION OF DDG 51 SHIPS FY23-27 NAICS 336611 SHIP BUILDING AND REPAIRING | Aug 1, 2023 to Feb 28, 2034 | N0002423C2307 ↗ |
| HUNTINGTON INGALLS INCORPORATED MS | $6.96 billion $6,958,780,647 | Department of Defense Department of the Navy | FY18-FY22 DDG 51 CLASS SHIP CONSTRUCTION NAICS 336611 SHIP BUILDING AND REPAIRING | Sep 27, 2018 to Jul 9, 2032 | N0002418C2307 ↗ |
| HUNTINGTON INGALLS INC VA | $6.65 billion $6,651,038,755 | Department of Defense Department of the Navy | TAS::17 1611::TAS CVN 78 SHIP CONSTRUCTION NAICS 336611 SHIP BUILDING AND REPAIRING | Aug 1, 2008 to Sep 30, 2022 | N0002408C2110 ↗ |
| BATH IRON WORKS CORPORATION ME | $6.59 billion $6,590,794,631 | Department of Defense Department of the Navy | CONSTRUCTION OF DDG 51 SHIPS FY23-27 NAICS 336611 SHIP BUILDING AND REPAIRING | Aug 1, 2023 to Feb 28, 2034 | N0002423C2305 ↗ |
| NATIONAL STEEL AND SHIPBUILDING COMPANY CA | $5.91 billion $5,913,186,703 | Department of Defense Department of the Navy | DETAIL DESIGN AND CONSTRUCTION (DD&C) FOR T-AO 205 NAICS 336611 SHIP BUILDING AND REPAIRING | Jun 30, 2016 to Mar 22, 2026 | N0002416C2229 ↗ |
| BATH IRON WORKS CORPORATION ME | $5.50 billion $5,498,027,274 | Department of Defense Department of the Navy | FY18-FY22 DDG 51 CLASS SHIP CONSTRUCTION NAICS 336611 SHIP BUILDING AND REPAIRING | Sep 27, 2018 to Dec 20, 2030 | N0002418C2305 ↗ |
| BATH IRON WORKS CORPORATION ME | $5.03 billion $5,025,968,517 | Department of Defense Department of the Navy | FY13-FY17 DDG 51 CLASS SHIP CONSTRUCTION. NAICS 336611 SHIP BUILDING AND REPAIRING | Jun 3, 2013 to Jan 31, 2027 | N0002413C2305 ↗ |
| BECHTEL PARSONS BLUE GRASS, A JOINT VENTURE KY | $5.01 billion $5,006,275,911 | Department of Defense Department of the Army | THE PURPOSE OF MODIFICATION P00003 - CLIN 0002 CONSTRUCTION IS TO DO THE FOLLOWING: 1. FY 09 RDTE FUNDS ARE HEREBY OBLIGATED IN THE AMOUNT OF $1,518,599.00 TO SUPPORT CONTINUED EFFORTS FOR PHASE IV LONG LEAD EQUIPMENT U NAICS 562211 HAZARDOUS WASTE TREATMENT AND DISPOSAL | Mar 19, 2009 to Oct 25, 2027 | W52P1J09C0013 ↗ |
| HUNTINGTON INGALLS INC VA | $4.58 billion $4,578,603,346 | Department of Defense Department of the Navy | DETAIL DESIGN AND CONSTRUCTION CVN 79 NAICS 336611 SHIP BUILDING AND REPAIRING | Jun 5, 2015 to Jul 31, 2025 | N0002415C2114 ↗ |
| HUNTINGTON INGALLS INC VA | $4.52 billion $4,519,300,324 | Department of Defense Department of the Navy | TAS::17 1611::TAS CVN79 CONSTRUCTION PREPARATION EFFORTS FY09 NAICS 336611 SHIP BUILDING AND REPAIRING | Jan 15, 2009 to Jul 31, 2025 | N0002409C2116 ↗ |
| HUNTINGTON INGALLS INCORPORATED MS | $3.37 billion $3,373,813,422 | Department of Defense Department of the Navy | DETAIL DESIGN AND CONSTRUCTION (DD&C) FOR LHA 8 (INITIAL EFFORT LIMITED TO PLANNING, ADVANCED ENGINEERING AND PROCUREMENT OF LONG LEAD TIME MATERIAL) NAICS 336611 SHIP BUILDING AND REPAIRING | Jun 30, 2016 to Dec 31, 2026 | N0002416C2427 ↗ |
| LOCKHEED MARTIN CORPORATION MD | $3.37 billion $3,366,427,733 | Department of Defense Department of the Navy | MMSC DETAILED DESIGN AND CONSTRUCTION NAICS 336611 SHIP BUILDING AND REPAIRING | Mar 2, 2018 to Jun 30, 2031 | N0002418C2301 ↗ |
| HUNTINGTON INGALLS INCORPORATED MS | $3.35 billion $3,345,822,881 | Department of Defense Department of the Navy | FY13-FY17 DDG 51 CLASS SHIP CONSTRUCTION. NAICS 336611 SHIP BUILDING AND REPAIRING | Jun 3, 2013 to Mar 31, 2027 | N0002413C2307 ↗ |
| DRAGADOS/HAWAIIAN DREDGING/ORION JV HI | $3.07 billion $3,071,394,028 | Department of Defense Department of the Navy | FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII NAICS 237990 OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION | Mar 31, 2023 to Sep 30, 2027 | N6274223F4007 ↗ |
| MARINETTE MARINE CORPORATION WI | $2.95 billion $2,952,523,292 | Department of Defense Department of the Navy | DETAIL DESIGN AND CONSTRUCTION OF FFG(X) GUIDED MISSILE FRIGATE NAICS 336611 SHIP BUILDING AND REPAIRING | Apr 30, 2020 to May 31, 2034 | N0002420C2300 ↗ |
| FISHER SAND & GRAVEL CO AZ | $2.83 billion $2,833,494,612 | Department of Homeland Security U.S. Customs and Border Protection | CONSTRUCT VERTICAL BORDER BARRIER NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Dec 17, 2025 to Aug 31, 2028 | 70B01C26F00000017 ↗ |
| AUSTAL USA, LLC AL | $2.81 billion $2,808,192,322 | Department of Defense Department of the Navy | CONSTRUCTION OF LCS FLIGHT 0+ SHIP NAICS 336611 SHIP BUILDING AND REPAIRING | Jun 23, 2017 to Sep 30, 2030 | N0002417C2301 ↗ |
| FISHER SAND & GRAVEL CO TX | $2.59 billion $2,594,040,000 | Department of Homeland Security U.S. Customs and Border Protection | BORDER BARRIER DESIGN BUILD FOR BBT-5 NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Jun 3, 2026 to Jul 27, 2027 | 70B01C26F00000405 ↗ |
| BATH IRON WORKS CORPORATION ME | $2.55 billion $2,551,316,435 | Department of Defense Department of the Navy | DDG 1001/1002 CONSTRUCTION AND FY11 CLASS SERVICES NAICS 336611 SHIP BUILDING AND REPAIRING | Sep 15, 2011 to Jun 29, 2025 | N0002411C2306 ↗ |
| THALLE CONSTRUCTION CO INC FL | $2.51 billion $2,514,144,742 | Department of Defense Department of the Army | CENTRAL EVERGLADES PLANNING PROJECT (CEPP) CONTRACT 11B, EVERGLADES AGRICULTURAL AREA (EAA) A-2 RESERVOIR EMBANKMENT AND STRUCTURES, PALM BEACH COUNTY, FLORIDA NAICS 237990 OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION | Sep 27, 2024 to Aug 19, 2031 | W912EP24C0018 ↗ |
| AMI METALS, INC TX | $2.02 billion $2,022,176,161 | Department of Homeland Security U.S. Customs and Border Protection | BULK STEEL FOR SOUTHWEST BORDER BARRIER CONSTRUCTION PROJECTS NAICS 541614 PROCESS, PHYSICAL DISTRIBUTION, AND LOGISTICS CONSULTING SERVICES | Feb 11, 2026 to Dec 31, 2028 | 70B01C26C00000006 ↗ |
| BOLLINGER MISSISSIPPI SHIPBUILDING, LLC MS | $2.02 billion $2,019,738,356 | Department of Defense Department of the Navy | POLAR SECURITY CUTTER #1 (FORMERLY HPIB) DETAIL DESIGN AND CONSTRUCTION NAICS 336611 SHIP BUILDING AND REPAIRING | Apr 23, 2019 to May 1, 2030 | N0002419C2210 ↗ |
| KOKOSING ALBERICI TRAYLOR, LLC MI | $1.94 billion $1,938,479,275 | Department of Defense Department of the Army | CONSTRUCTION OF THE NEW THIRD LOCK, NEW LOCK AT THE SOO, SAULT STE. MARIE, MICHIGAN. NAICS 237990 OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION | Jun 30, 2022 to Jul 8, 2029 | W911XK22C0006 ↗ |
| 381 CONSTRUCTORS ME | $1.82 billion $1,822,402,355 | Department of Defense Department of the Navy | P-381 MULTI-MISSION DRY DOCK #1, PORTSMOUTH NAVAL SHIPYARD, KITTERY, ME NAICS 237990 OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION | Aug 13, 2021 to Mar 30, 2029 | N4008521C0077 ↗ |
| FISHER SAND & GRAVEL CO NM | $1.79 billion $1,787,500,000 | Department of Homeland Security U.S. Customs and Border Protection | DESIGN AND CONSTRUCT NEW VERTICAL BARRIER AND POWER DISTRIBUTION, LIGHTING, CAMERAS, EQUIPMENT SHELTERS AND LINEAR GROUND DETECTION SYSTEM (LGDS) IN HILDAGO COUNTY, NM. NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Jan 7, 2026 to Aug 31, 2028 | 70B01C26F00000073 ↗ |
| BARNARD CONSTRUCTION COMPANY, INCORPORATED TX | $1.77 billion $1,770,847,986 | Department of Homeland Security U.S. Customs and Border Protection | BORDER WALL CONSTRUCTION FOR EL PASO SECTOR - EPT-5 NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Apr 24, 2026 to Aug 31, 2028 | 70B01C26F00000292 ↗ |
| SOUTHWEST VALLEY CONSTRUCTORS CO TX | $1.72 billion $1,720,040,000 | Department of Homeland Security U.S. Customs and Border Protection | AWARD OF CONSTRUCTION TASK ORDER FOR BORDER WALL IN BIG BEND TEXAS, SEGMENT IDENTIFIED AS BBT-4. NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | May 11, 2026 to May 11, 2027 | 70B01C26F00000345 ↗ |
| FISHER SAND & GRAVEL CO AZ | $1.65 billion $1,650,754,000 | Department of Homeland Security U.S. Customs and Border Protection | YUM-2 VERTICAL BORDER AND WATERBORNE BARRIER CONSTRUCTION NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Dec 23, 2025 to Dec 31, 2028 | 70B01C26F00000044 ↗ |
| LOCKHEED MARTIN CORPORATION MD | $1.64 billion $1,639,354,125 | Department of Defense Department of the Navy | CONSTRUCTION OF LCS FLIGHT 0+ SHIP NAICS 336611 SHIP BUILDING AND REPAIRING | Oct 6, 2017 to Oct 31, 2027 | N0002418C2300 ↗ |
| BECHTEL NATIONAL, INC. VA | $1.54 billion $1,540,889,354 | National Aeronautics and Space Administration | DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). NAICS 236210 INDUSTRIAL BUILDING CONSTRUCTION | Jul 1, 2019 to Jun 5, 2026 | 80KSC019C0013 ↗ |
| SEQIRUS INC MA | $1.43 billion $1,430,622,665 | Department of Health and Human Services Office of Assistant Secretary for Preparedness and Response | TAS::75 0140::TAS CONSTRUCTION OF VACCINE MANUFACTURING FACILITY NAICS 236210 INDUSTRIAL BUILDING CONSTRUCTION | Jan 15, 2009 to Sep 30, 2029 | HHSO100200900101C ↗ |
| RAYTHEON COMPANY MA | $1.34 billion $1,342,483,318 | Department of Defense Department of the Air Force | QATAR EARLY WARNING RADAR- CONSTRUCTION OF RADAR AND SUPPORT BUILDINGS NAICS 334511 SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTE | Feb 24, 2017 to Dec 31, 2027 | FA873017C0010 ↗ |
| SLS FEDERAL SERVICES LLC AZ | $1.31 billion $1,313,227,200 | Department of Homeland Security U.S. Customs and Border Protection | BORDER WALL CONSTRUCTION FOR TCA-5 TON. NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Jun 26, 2026 to Sep 14, 2027 | 70B01C26F00000385 ↗ |
| FISHER SAND & GRAVEL CO CA | $1.23 billion $1,225,325,000 | Department of Homeland Security U.S. Customs and Border Protection | CONSTRUCTION BORDER BARRIER EL CENTRO, CA NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Sep 26, 2025 to Mar 20, 2028 | 70B01C25F00001112 ↗ |
| FISHER SAND & GRAVEL CO TX | $1.22 billion $1,223,124,000 | Department of Homeland Security U.S. Customs and Border Protection | BORDER WALL CONSTRUCTION - VERTICAL BARRIER, BIG BEND TEXAS SECTOR (BBT-2) NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Feb 13, 2026 to Sep 5, 2027 | 70B01C26F00000169 ↗ |
| SPENCER CONSTRUCTION LLC TX | $1.15 billion $1,147,001,057 | Department of Homeland Security U.S. Customs and Border Protection | BORDER BARRIER CONSTRUCTION NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Mar 18, 2026 to Aug 31, 2028 | 70B01C26F00000261 ↗ |
| RAUMA MARINE CONSTRUCTIONS OY | $1.12 billion $1,122,648,775 | Department of Homeland Security U.S. Coast Guard | PURCHASE OF TWO ARCTIC SECURITY CUTTERS FOR THE USCG NAICS 336611 SHIP BUILDING AND REPAIRING | Dec 26, 2025 to Mar 26, 2029 | 70Z02326C93210001 ↗ |
| FERROVIAL CONSTRUCCION PR, LLC PR | $1.08 billion $1,078,991,952 | Department of Defense Department of the Army | RIO PUERTO NUEVO FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 3 CHANNEL BOTTOM AND WALL IMPROVEMENTS IN SAN JUAN, PR. INCLUDES CHANNEL WIDENING AND DEEPENING, DRILLED SHAFT WALLS, DREDGING, AND UTILITY RELOCATIONS. NAICS 237990 OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION | Apr 30, 2026 to Jul 11, 2032 | W51DQV26CA003 ↗ |
| BARNARD CONSTRUCTION COMPANY, INCORPORATED TX | $1.03 billion $1,030,175,506 | Department of Homeland Security U.S. Customs and Border Protection | BORDER BARRIER CONSTRUCTION IN HUDSPETH COUNTY, TX NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Mar 5, 2026 to Aug 31, 2028 | 70B01C26F00000152 ↗ |
| WALSH - TURNER JV II KY | $971.8 million $971,775,608 | Department of Defense Department of the Army | AWARD OF THE VA LOUISVILLE MEDICAL CENTER - LOUISVILLE, KY NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Sep 10, 2021 to Apr 7, 2027 | W912QR21C0027 ↗ |
| BARNARD CONSTRUCTION COMPANY, INCORPORATED TX | $960.4 million $960,423,540 | Department of Homeland Security U.S. Customs and Border Protection | BBT-3 BORDER BARRIER CONSTRUCTION PROJECT NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Mar 5, 2026 to May 26, 2027 | 70B01C26F00000201 ↗ |
| TRUMBULL CORPORATION AND BRAYMAN CONSTRUCTION CORPORATION, A JOINT VENTURE PA | $914.9 million $914,945,706 | Department of Defense Department of the Army | NEW RIVER CHAMBER AT MONTGOMERY LOCKS & DAM NAICS 237990 OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION | Sep 26, 2024 to Oct 30, 2031 | W911WN24C8011 ↗ |
| BCCG A JOINT VENTURE TX | $873.5 million $873,510,389 | Department of Homeland Security U.S. Customs and Border Protection | CONSTRUCTION OF BORDER BARRIER WALL SYSTEM. NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Sep 24, 2025 to Oct 31, 2028 | 70B01C25F00001121 ↗ |
| FISHER SAND & GRAVEL CO CA | $847.0 million $847,040,000 | Department of Homeland Security U.S. Customs and Border Protection | SW BORDER CONSTRUCTION - SAN DIEGO NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Apr 26, 2026 to Aug 31, 2028 | 70B01C26F00000311 ↗ |
| BL HARBERT INTERNATIONAL LLC | $818.7 million $818,669,847 | Department of State | BASE AWARD FOR CONSTRUCTION MANAGER AS CONSTRUCTOR CLIN-001 FOR DESIGN-PHASE SERVICES FOR HANOI NEC. NAICS 541310 ARCHITECTURAL SERVICES | Jan 14, 2022 to Nov 30, 2029 | 19AQMM22C0048 ↗ |
| WESTON SOLUTIONS INC PR | $816.2 million $816,199,719 | Department of Defense Department of the Army | !!PR-POWERFY23!! TEMPORARY POWER GENERATION AT THE PALO SECO POWER PLANT NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Feb 24, 2023 to Mar 30, 2026 | W9128F23F0065 ↗ |
| MCCARTHY HITT - NEXT NGA WEST JOINT VENTURE MO | $769.9 million $769,874,785 | Department of Defense Department of the Army | N2W NGA FY18 DESIGN AND CONSTRUCTION (PHASE 1) NAICS 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION | Mar 19, 2019 to Jan 22, 2026 | W912DQ19C7001 ↗ |
| FORGEN-ODIN JV FL | $768.9 million $768,924,318 | Department of Defense Department of the Army | CENTRAL EVERGLADES PLANNING PROJECT (CEPP) CONTRACT 11A, EVERGLADES AGRICULTURAL AREA (EAA) A-2 RESERVOIR FOUNDATION & CUTOFF WALL PROJECT NAICS 237990 OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION | Sep 30, 2022 to Mar 15, 2028 | W912EP22C0017 ↗ |